RE-STRUCTURING OF CADRE ARTISAN STAFF IN DEFENCE RRS FOR THE POST OF MCM AND CM
Ministry of Defence
D(Civ-I)
Subject: Restructuring of cadre artisan staff in Defence Establishments in modification of recommendations of 6th CPC – framing of Recruitment Rules for the posts of Master Craftsman (MCM) and Chargeman both in the same GP of Rs.4200/-
Consequent upon the restructuring of the Artisan Cadre vide MoD letter of even number dated the 14.06.2010 framing of RRs for the posts of Master Craftaman and Chargeman could not be finalized as DOP&T has objection to promotion of MCM as Chargeman in the same GP of Rs.4200/-. Moreover, Ministry of Finance has also not agreed to grant of increment to MCM on their promotion in the same GP of Rs.4200/- to the post of Chargemen.
2. To overcome the situation as explained in paragraph I above, one of the model proposed for promotions of artisan staff cadre is indicated below :
Skilled Grade (PB-I, GP Rs.1900) |
||||
↓ | ||||
Highly Skilled Grade – II (PB-1, GP Rs.2400) |
→ | (7 years as HS-II through LDCE) | → | Chargeman (PB-2, GP Rs.4200) |
↓ | ↓ | |||
Highly Skilled Grade-I (PB-1, GP Rs.2800) |
→ | (4 years as HS-I through LDCE) | → | Chargeman (PB-2, GP Rs.4200) |
↓ | ↓ | |||
Master Craftsman (PB-2, GP Rs.4200) |
Chargeman (PB-2, GP Rs.4200) |
|||
↓ | ↓ | |||
→ | (on eligibility basis) (Foreman / JWM) (PB-2, GP Rs.4600) |
← |
3. As per the above model the following is proposed :
(i) HS-II (GP Rs.2400/-) shall be able to move as HS-I (GP Rs.2800/-) under normal promotion norms. One completion of 7 years of service HS-II shall be eligible for the post of Chargeman on the basis of Limited Departmental Competitive Examination (LDCE).
(ii) HS-I (GP Rs.2800/-) shall be able to move as Master Craftsman (GP Rs.4200/-) under normal promotion norms. One completion of 4 years of service HS-I shall be eligible for the post of Chargeman on the basis of Limited Departmental Competitive Examination (LDCE).
(iii) Both Master Craftsman and Chargeman shall be able to move as Foreman / JWM (PB-2, Rs.4600/-) as the case may be on eligibility basis.
4. All concerned are requested to furnish their comments on the above proposed model of RRs for the posts of Master Craftsman and Chargeman with the approval of competent authority by 7th February 2014 positively.
sd/-
(M.S.Sharma)
Under Secretary (Civ-I & II)
source-INDWF
Leave a Reply